How to calculate
Multiply variable cost per unit by planned quantity and add fixed costs. With two observations, the difference in total cost divided by the change in volume estimates the variable rate.
Worked example
Use Input method Known fixed and variable costs · Planned units to evaluate 400 · Total fixed costs (USD) 4500 · Variable cost per unit (USD) 12.5. The result is 9500.00 USD.
Input and result notes
Enter the planned units in either mode. Complete only the input group for the mode you choose.